SKA conducted a condition assessment and evaluation of BB&T Field on the campus of Wake Forest University in September 2005. The condition assessment identified structural and durability issues that should be addressed in the next two years to ensure safety and an extended service life of the structure. SKA’s report included quantified information on the magnitude of the structural and maintenance repairs so repair costs could be projected. SKA also prepared contract documents for repairs. The West side stand repairs were completed in 2006. The repairs included new deck coatings and sealants, concrete column and beam repairs, raker beam repairs, concrete corrosion mitigation, seat anchorages, drain replacement, and hydro-excavation underneath the stands. In 2009 SKA oversaw the structural repairs on the East side of the stands. These repairs included the construction of new restroom and concession facilities, new drainage system tie-ins underneath the stands, new deck coatings and sealants, concrete column and raker beam repairs, and concrete corrosion mitigation. In all phases, SKA designed all repairs for corrosion induced spalls in the concrete, water management for the angle slabs, corrosion management of the existing structure, soil erosion, and structural/waterproofing repairs.


Owner: Wake Forest University (WFU)

Size: 31,500 Seating Capacity

Market: , ,

Project Type: , ,