Mission Hospital Custom Air Handling UnitAsheville, North CarolinaCloseA 16,000 cfm custom air-handling unit was installed in the Fullerton building and commissioned by SKA. The unit consisted of two chilled water coils, steam preheat coils, VFD’s, air flow monitoring stations, steam humidifier, economizer controls, smoke purge and smoke evacuation. SKA commissioned the unit which included seasonal commissioning, verification of every control point, and testing of the smoke evacuation and smoke purge systems. |
|
|
||
|